Snowfall: Lowari Top opens for traffic

The heavy snowfall that added to the miseries of locals led to the closure of the Top

CHITRAL:
Lowari Top opened for traffic on Sunday after 12 days. The route was closed due to heavy snowfall. The residents of Chitral expressed joy over the opening of Lowari Top and lauded the efforts of the Pakistan Army in this regard. The heavy snowfall that added to the miseries of locals led to the closure of the Top. As a result, travellers had to use Lowari Tunnel for commuting which opens for two days a week; authorities do not allow travellers and heavy vehicles to enter the tunnel owing to construction work.


Published in The Express Tribune, January 18th, 2016.
Load Next Story