
This is the first step towards the construction of a 120MW power plant at Sukkur Barrage.
The plant will be able to produce a maximum of 150MW. MPA Rai Naz Bozdar pointed to some potential problems with the proposed plant.
She said that residents of lower Sindh may be affected and the present distribution of water to Balochistan from the Sukkur Barrage could be reduced.
Published in The Express Tribune, April 9th, 2011.
COMMENTS
Comments are moderated and generally will be posted if they are on-topic and not abusive.
For more information, please see our Comments FAQ