Foreign Investment: Korean solar energy firm offers 300MW

Korea wants to shift Prime Minster House to solar energy system.


May 03, 2012

ISLAMABAD: A Korean firm has shown interest in producing 300 megawatt of electricity through solar means, saying that it can produce 50 megawatt power within ten months. The Korean firm CX Solar’s delegation met Water and Power Minister Naveed Qamar and discussed the proposition. The delegation led by Dr Choi Moon Sok said that the entire project of 300MW can be completed by 2015 and investment has been arranged for the project. He said that Korea wants to shift Prime Minster House to solar energy system and it will be gifted from Seoul to Islamabad.

Published in The Express Tribune, May 3rd, 2012.

COMMENTS

Replying to X

Comments are moderated and generally will be posted if they are on-topic and not abusive.

For more information, please see our Comments FAQ