Urban development: Road linking Ferozeour Road to Multan Road opened

The three-lane dual carriageway is 11 metres wide on each side


Our Correspondent April 25, 2015
DESIGN: TALHA KHAN

LAHORE:


The Lahore Development Authority (LDA) has completed the construction of a 2.1-km link road from LOS Ferozeour Road to Multan Road. The road was opened for traffic on Saturday.


An LDA spokesperson said it was the first road in the city that had been built to cover an up to 60-foot-wide Cantt Drain. The three-lane dual carriageway is 11 metres wide on each side. Initially, more than 70,000 vehicles would use the road. Parking lots,  footpaths and de-silting chambers have been constructed on both sides of the road.

Published in The Express Tribune, April 26th, 2015.

COMMENTS

Replying to X

Comments are moderated and generally will be posted if they are on-topic and not abusive.

For more information, please see our Comments FAQ