WB offers equipment, technical assistance to control gas leak

A team of the WB is offering equipment and technical support to control the Rs7.5 billion per annum gas losses.


Kashif Hussain June 24, 2010

KARACHI: A team of the World Bank is offering equipment and technical support to control the Rs7.5 billion per annum losses from leakages and gas theft in Pakistan. They also say that the World Bank is considering giving $250 million to help in this regard.

This was discussed during a meeting of the World Bank team with officials of Sui Southern Gas Company, Sui Northern Gas Pipelines and Pakistan Standard and Quality Control Authority overseeing the standard of gas pipes and instruments in the country.

An official of the bank stated that the organisation was keen to assist the Pakistan Standard and Quality Control Authority (PSQCA) with standardisation and quality control in the country.

The meeting was held at PSQCA head office between Irfan Nadeem, Director General PSQCA and Bjorn Hamso of World Bank.

The rate of Unaccounted-For-Gas (UFG) of Sui Northern and Sui Southern have reached 8.1 and 8 per cent respectively against the rate of 5.15 set by Oil and Gas Regulatory Authority (Ogra) which could cause the country losses worth Rs4.6 billion and Rs2.8 billion for the current year 2009-10. The use of worn out pipe for gas distribution in Pakistan is causing a surge in gas leak causing is the main reason for these losses.

World Bank stresses the use of good quality pipelines and asks Pakistan to avoid using sub standard gas instruments at a domestic and commercial level so that gas wastage can be curbed.

The collaboration between the bank and Pakistan will help improve PSQCA experience in promoting gas appliances specially testing facilities related to thermal efficiency. Their meeting will help overcome the trade barriers relating to gas appliances companies and PSQCA National standards body.

The National Standards Body and World Bank have agreed to ink a Mutual Recognition Agreement (MRA).  The PSQCA has further requested that the World Bank provide necessary technical assistance in respect of trainings and laboratory equipment as well. The modalities in this regard with Gas Appliances companies are agreed to be expeditiously worked out to be assessed by PSQCA.

Earlier the World Bank offered Sui Southern Gas Company $115 million to improve its infrastructure and increase its utilization efficiency. This was offered after the Ministry for Petroleum and Natural resources sought the World Bank Energy Mission’s assistance in reducing UFG losses by optimizing supply pressure, rehabilitating pipelines and curbing theft. Under the UFG programme, 3,350 kilometres of pipeline will be replaced.

Published in The Express Tribune, June 24th, 2010.

COMMENTS (1)

Muhammad Asif | 14 years ago | Reply It is very good effort by the world bank and Pakistan Standard and Quality Control Authority(PSQCA)to minimize the gas losess by leakege but the most important thing about which OGRA and PSQCA should pay attention is increasing trend of gas theft specially in indutrial including CNG sector and in commercial sector>The gas companies of pakistan (SNGPL and SSGPL)have no any law against these culprits like the WAPDA have. Ogra should pay attention regarding law makining to streangthing the people working against gas theft.Unfortunatily From three basic reasons leakege<theft<underbilling of Unaccounted For Gas (UFG)only the PSQCA IS PAYING ATTENTION TOWARDS LEAAAAKEGES and the other two reasons are totaly being neglected for the sake of our countries economy and the sever shortage of energy reserves the athorities should take necessary measures on every aspect to save gas reservos.
Replying to X

Comments are moderated and generally will be posted if they are on-topic and not abusive.

For more information, please see our Comments FAQ